Robust Network & Digital Infrastructure for Nashik District Court
- Mar 8
- 2 min read

Overview
Racca Infotech Pvt. Ltd. (RIPL) successfully delivered the complete ELV and networking infrastructure for the Nashik District Court, a major judicial facility spread across approx. 3 lakh sq. ft. with 7 floors. The project required a reliable and scalable IT backbone to support modern courtroom operations and administrative functions.
As part of the deployment, RIPL implemented a robust passive networking infrastructure using trusted brands such as Legrand and Netgear, enabling connectivity for approx. 600 data points across the building. The project also included the installation of an IPPBX communication system from Matrix, ensuring seamless internal communication across departments.
A key component of the project was the setup of 45 modern courtrooms, each equipped with displays, power supply arrangements, and complete networking infrastructure. In total, approx. 120 Hikvision displays were installed throughout the premises to support information display and courtroom operations. The court building was officially inaugurated on September 27, 2025.
Project Challenges
Executing a project of this scale within a functioning judicial infrastructure required careful planning and coordination. The large area, multi-floor layout, and the need to integrate networking, displays, and courtroom infrastructure within a limited timeframe presented significant operational challenges. Additionally, the installation had to be carried out while ensuring reliability, structured cabling standards, and seamless integration across all courtrooms and administrative areas.
RIPL's Solution Deployment
Leveraging its expertise in large-scale IT and ELV deployments, Racca Infotech Pvt. Ltd. (RIPL) designed and implemented a structured network architecture to support all courtroom and administrative requirements. RIPL’s team executed the complete deployment—from network infrastructure to courtroom technology integration—within an efficient approx. 1.5 to 2 months timeline. Through meticulous planning, quality components, and experienced engineering teams, RIPL successfully delivered a modern, digitally enabled infrastructure for the Nashik District Court.